East Brunswick Board of Education

RTU Replacements at Various Schools

Back

Project Information

Client NameEast Brunswick Board of Education
Bids Due/Opening7 June 2018, at 11:00 AM at the Board Offices, 760 Route 18, East Brunswick, NJ 08816
Pre-Bid Walk Through22 May, 2018 at 10:00 A.M. (Meet at main office of school)
Project # & NamePSA#(s) 7493: RTU Replacements at Various Schools
Cost of Documents$50.00 Non-Refundable.
Bidding documents will be released only in full sets. Partial sets, or sets split out by trade will not be released. Bid Documents may be delivered to recipients at their request upon our receipt of fee and arrangements for payment of delivery.
Project ArchitectJohn Carton
Drawings Available17 May 2018 at the offices of Parette Somjen Architects L.L.C.
Drawings will be available for contractor review Monday - Thursday from 9:00am - 4:00 pm and Friday from 9:00am - 1:00 pm.
Bidding RequirementsBids will be accepted from a single general contractor for a lump sum bid only
Project DescriptionThe scope of this project includes, but is not limited to, the replacement of the existing RTU in J-Hall in kind with a new heating/ventilating RTU. Existing distribution and controls to be reused, if viable.

The scope of this project includes, but is not limited to, the replacement of 8 existing RTUs at Frost Elementary School in kind with a new heating/ventilating/air conditioning RTUs. Existing distribution and controls to be reused, if viable. All existing ducts to be reused. Roof curbs and flashing will be modified as required. Any structural modifications that are required will be provided as well.

The scope of this project includes, but is not limited to, the replacement of 8 existing RTUs in kind with new heating/ventilating/air conditioning RTUs and the removal and replacement of a portion of the roofing system at Warnsdorfer Elementary School. Existing distribution and controls to be reused, if viable. All existing ducts to be reused. Roof curbs and flashing will be modified as required. Any structural modifications that are required will be provided as well. There will be a new roofing membrane installed, new insulation, new roof drains, and new metal edge fascia, as well as various additional roofing components necessary for the installation of the new roofing system.
DPMC Qualification(C032) HVACR
Commence Construction2 Days after Notice to Proceed
Substantial Completion28 September 2018
Addendum Issued:
Bid Results Bid Results

Bidder Pick Up List

 East Brunswick Board of Education
RTU Replacements at Various Schools
PN: 7493
 
Company NameAddressCompany Phone
Pravco, Inc.245 Wescott Drive, Rahway, NJ 07065732-388-0800
Liberty Mechanical Contractors330-336 Raymond Blvd., Newark, NJ 07105973-344-6131
Direct Digital Control Systems, Inc. (DDC)22555 Morning Glory Circle, Bradenton, FL 34202973-257-3011
Hanna's Mechanical Contractors, Inc.4 North Main Street, Milltown, NJ 08850732-249-4911
Sunnyfield Corporation3413 Rose Avenue, Ocean, NJ 07712732-922-0006
Bill Leary A/C & Heating6 Green Street, Metuchen, NJ 08840732-494-9200
ConstructConnect30 Technology Parkway South, Suite 100, Norcross, GA 30092800-364-2059
Echelon Services, LLC.*3505 Route 94, Hamburg, NJ 07419
159 Merriam Avenue, Newton, NJ 07419
973-250-4090
Centralpack359 Green Pond Road, Hibernia, NJ 07842973-625-9230
H & S Construction721 Bayway Avenue, Elizabeth, NJ 07202908-352-4345
AMCO Enterprises, Inc.600 Swenson Drive, Kenilworth, NJ 07033908-241-4199