Middlesex Board of Education

Unit Ventilator Replacement at Von E. Mauger Middle School

Back

Project Information

Client NameMiddlesex Board of Education
Bids Due/OpeningWednesday, January 23rd, 2019 at 11:00 AM located at the Middlesex BOE Board Office at Middlesex High School, 300 John F. Kennedy Drive, Middlesex, NJ 08846
Pre-Bid Walk ThroughTuesday, December 18th, 2018 at 3:00 PM, located at the Von E. Mauger Middle School, Fisher Ave,
Middlesex, NJ 08846
Project # & NamePSA#(s) 7680: Middlesex BOE: Unit Ventilator Replacement at Von E. Mauger Middle School
Cost of Documents$25.00 Non-Refundable.
Bidding documents will be released only in full sets. Partial sets, or sets split out by trade will not be released. Bid Documents may be delivered to recipients at their request upon our receipt of fee and arrangements for payment of delivery.
Project ArchitectRachel Tiedemann
Drawings AvailableTuesday, November 27, 2018
Bidding RequirementsBids will be accepted from a single general contractor for a lump sum bid only
Project DescriptionThe scope of work for this project includes, but is not limited to, replacement of existing unit ventilators, replacement of existing cabinet heaters, new piping for heating elements, new controls connecting to the BMS system, new flooring, and new shelving.
1. Perform Work of Contract under fixed cost contract with Owner in accordance with Conditions of Contract.
2. If it is deemed necessary, removal of any asbestos laden materials will be the responsibility of the contractor. The contractor awarded this contract will also be responsible for coordinating the asbestos abatement with the asbestos subcontractor. The district will be responsible for all asbestos monitoring.
• Construction First Floor including Boiler Room: ± 11, 351 SF
• Area of Construction Tunnels: $3,091SF
• Unit Ventilator Replacement at Von E. Mauger Middle School
• Alterations include
o New hot water piping
o New pumps
o New Heat Exchanger
o New Unit Ventilators with built-in casework
o New controls to the BMS system
o Floor abatement under existing casework and UVs
o New Floors (alternate)
o New floor access hatches to tunnel w/ structure.
o New ceiling in limited area.
DPMC QualificationC008 General Construction
C009 General Construction / Alterations & Additions
C032 HVACR as Prime
Commence ConstructionMonday, June 3rd, 2019 2nd Shift. 1st Shift Construction to begin on Thursday, June 20th, 2019
Substantial CompletionMonday, August 26th, 2019
Addendum Issued: