Project Number:

8066MS-HVAC PH B

Millburn Board of Education

Re-Bid HVAC Upgrades (Phase B) at
Millburn Middle School

Project Information:

Client:

Project Name:

Project Architect:

Project Description:

Millburn Board of Education

Re-Bid HVAC Upgrades (Phase B) at
Millburn Middle School

Rachel Tiedemann

The scope of this project includes, but is not limited to, HVAC Upgrades to the 1930s / Auditorium /  Cafeteria Wing, the Annex, and the Science Wing at Millburn Middle School. This package depicts Phase  B (Phase 1,2,3) of a two-phase building wide project. This project was superseded by Phase A, which  involved the removal and replacement of five (5) rooftop ventilation units over the Annex, 1930’s Wing,  and Science Wing. This work occurred during the Summer of 2021. Phase B shall include heating / air conditioning upgrades, upgrades to ventilation ductwork served by  the ERU’s replaced in Phase A. The heating / air conditioning upgrades shall involve the removal of  existing unit ventilators, ground source heat pumps, and air handlers serving the Annex,  1930s/Cafeteria/Auditorium Wing, and Science Wing. These system(s) shall be replaced with new VRF  units serving the 1930 Wing and Annex, a new RTU serving the 1930 Library, and new boiler plants, a  new Air Handler / modified RTU’s serving the Auditorium / Cafeteria; all of these systems shall be  controlled through the existing Automated Building Management System. Bid Phase B shall be phased,  as outlined in the Instructions to Bidders and is scheduled to occur over the summer 2022 and 2023.

Bid Information:

DPMC Qualification:

Cost of Documents:

Bidding Requirements:

(C032) HVACR (C008) GENERAL CONSTRUCTION or (C009) GENERAL
CONSTRUCTION / ALTERATIONS & ADDITIONS
(C029) STRUCTURAL STEEL AND ORNAMENTAL IRON
(C030) PLUMBING
(C045) SPRINKLER SYSTEMS
(C047) ELECTRICAL
(C092) ASBESTOS REMOVAL / TREATMENT

$00.00 Non
-Refundable.
Bidding documents will be released only in full sets. Partial sets, or
sets split out by trade will not be released. Bid Documents may be
delivered to recipients upon request submitted to
rtiedemann@planetpsa.com
.

Bids will be accepted from a single general contractor for a lump sum bid only.

Schedule:

Drawings Available:

Pre-Bid Walkthrough:

Addendum:

Bids Due / Opening:

Commence Construction:

Substantial Completion:

Tuesday, November 16thth, 2021, via download from FTP
Website. Requests may be submitted to
rtiedemann@planetpsa.com

A pre-bid meeting is not scheduled for this project.
Requests to visit the site may be submitted to
rtiedemann@planetpsa.com

Thursday, December 9th, 2021, at 1:00PM at the Board
Offices at 434 Millburn Ave, Millburn, New Jersey, 07041

Monday, March 21st, 2022

Friday, August 25th, 2023

Bidder's List:

Bidders
Address
Telephone
Bidders
Address
Telephone