Project Number:
8317
Andover Regional Board of Education
Partial Roof Replacement at Long Pond School
Project Information:
Client:
Project Name:
Project Architect:
Project Description:
Andover Regional Board of Education
Partial Roof Replacement at Long Pond School
Joshua Thompson
The scope of the project includes, but is not limited to, the removal of ±15,550 sf of the existing roofing system located at the front portion of the school and replacement with a new build-up modified bituminous roofing system. Existing perimeter metal edgework, roof drains, and flashing to be replaced with new.
Bid Information:
DPMC Qualification:
Cost of Documents:
Bidding Requirements:
(C068) Roofing-Membrane Modified Bitumen; (C047) Electrical
$25.00 Non-Refundable.
Bids will be accepted from a single general contractor for a lump sum bid only.
Schedule:
Drawings Available:
Pre-Bid Walkthrough:
Addendum:
Bids Due / Opening:
Commence Construction:
Substantial Completion:
Friday, February 21, 2020, at the offices of Parette Somjen Architects L.L.C. Drawings available for contractor review Monday – Friday from 9:00 am – 4:00 pm
Tuesday, February 25, 2020 at 11:00 am
Friday, February 28, 2020
Wednesday, March 11, 2020 at 12:30 pm
Monday, June 29, 2020
Friday, August 07, 2020
Bidder's List: