The scope of work includes, but is not limited to removal of the existing roofing system and installation of a new built up membrane roofing system.

Bid Information:

DPMC Qualification:

Cost of Documents:

Bidding Requirements:

(C008) General Construction and/or (C009) General Construction / Alterations and Additions

$25.00 Non-Refundable.

Bids will be accepted from a single general contractor for a lump sum bid only.

Schedule:

Drawings Available:

Pre-Bid Walkthrough:

Addendum:

Bids Due / Opening:

Commence Construction:

Substantial Completion:

Friday, December 10, 2020 at the offices of Parette Somjen Architects L.L.C. Drawings available for contractor review Monday – Friday from 9:00 am – 4:00 pm

Wednesday, January 15, 2020 @ 2:30pm. Meet at the High School main office located at 1 Samuel Lupo Pl, Woodbridge, NJ 07095

Friday, January 24, 2020

Thursday, February 6, 2020 at 12pm. Please meet at the Board Office at 428 School Street, Woodbridge, New Jersey 07095

Monday, June 22, 2020

On or before Friday, August 21, 2020