Project Description:
Woodbridge Board of Education
Partial Roof Replacement at Woodbridge High School
William H. Bannister
The scope of work includes, but is not limited to removal of the existing roofing system and installation of a new built up membrane roofing system.
Bid Information:
DPMC Qualification:
Cost of Documents:
Bidding Requirements:
(C008) General Construction and/or (C009) General Construction / Alterations and Additions
$25.00 Non-Refundable.
Bids will be accepted from a single general contractor for a lump sum bid only.
Schedule:
Drawings Available:
Pre-Bid Walkthrough:
Addendum:
Bids Due / Opening:
Commence Construction:
Substantial Completion:
Friday, December 10, 2020 at the offices of Parette Somjen Architects L.L.C. Drawings available for contractor review Monday – Friday from 9:00 am – 4:00 pm
Wednesday, January 15, 2020 @ 2:30pm. Meet at the High School main office located at 1 Samuel Lupo Pl, Woodbridge, NJ 07095
Friday, January 24, 2020
Thursday, February 6, 2020 at 12pm. Please meet at the Board Office at 428 School Street, Woodbridge, New Jersey 07095
Monday, June 22, 2020
On or before Friday, August 21, 2020