Project Number:

8322

Montclair Board of Education

Proposed Improvements at Various Schools:

Project Information:

Client:

Project Name:

Project Architect:

Project Description:

Montclair Board of Education

Proposed Improvements at Various Schools:

C. William Ross

The scope of this project includes, but is not limited to, the installation of new in attic insulation at Bradford Elementary School; new inclined platform chair lift installation at Edgemont Elementary School; and the removal and replacement of an existing inclined platform chair lift with new at Nishuane Elementary School.

Bid Information:

DPMC Qualification:

Cost of Documents:

Bidding Requirements:

(C008) General Construction -Or- (C009) General Construction / Alterations and Additions

Specifications, proposal forms, etc. may be obtained on May 8, 2020, via downloaded from the FTP website. Said bidding documents may be obtained by submitting a request to wross@planetpsa.com. Bidding documents will not be mailed, emailed or available for pickup or inspection. They may only be downloaded from the FTP website with access granted among request.

Bids will be accepted from a single general contractor for a lump sum bid only.

Schedule:

Drawings Available:

Pre-Bid Walkthrough:

Addendum:

Bids Due / Opening:

Commence Construction:

Substantial Completion:

Friday, May 8, 2020 only via download from the FTP website with access granted among request. Said bidding documents may beobtained by submitting a request to wross@planetpsa.com.

No Pre-Bid is scheduled. The bid documents will include photos of the existing conditions

Wednesday, May 27, 2020

Tuesday, June 9, 2020 @ 1:00PM. The Bid Opening will be a Virtual Meeting.

Monday, June 29, 2020

Friday, August 21, 2020

Bidder's List:

© 2020 Parette Somjen Architects, LLC

|

email.png