Project Number:
8330
Montclair Board of Education
Buzz Aldrin MS Stair 4 & Stair 5 Replacement
Project Information:
Client:
Project Name:
Project Architect:
Project Description:
Montclair Board of Education
Buzz Aldrin MS Stair 4 & Stair 5 Replacement
C. William Ross
The scope of the project includes, but is not limited to, the removal and replacement of the lower runs (Ground to First Floor) of two existing stairwells, including new steel stringers, concrete filled steel pans, and metal railings.
Bid Information:
DPMC Qualification:
Cost of Documents:
Bidding Requirements:
(C008) General Construction -Or- (C009) General Construction / Alterations and Additions
Bids will be accepted from a single general contractor for a lump sum bid only.
Schedule:
Drawings Available:
Pre-Bid Walkthrough:
Addendum:
Bids Due / Opening:
Commence Construction:
Substantial Completion:
Tuesday, April 28, 2020 only via download from the FTP website with access granted among request. Said bidding documents may be obtained by submitting a request to wross@planetpsa.com.
No Pre-Bid is scheduled. The bid documents will include photos of the existing conditions.
Friday, May 08, 2020
Wednesday, May 20, 2020 @ 1:00 PM. Please meet at the Board Office, 22 Valley Road, Montclair, NJ 07042.
Monday, June 29, 2020
Friday, August 21, 2020