Project Number:

8374

Parsippany Troy Hills Board of Education

Parsippany Hills High School Roof Replacement

Project Information:

Client:

Project Name:

Project Architect:

Project Description:

Parsippany Troy Hills Board of Education

Parsippany Hills High School Roof Replacement

Steven Colella

The scope of the project includes, but is not limited to, the scope of this project includes the removal of the existing roof system and insulation down to the substrate. Installation of a new built-up membrane roof system with tapered insulation and new drains throughout the areas to meet all current codes including, but not limited to, all energy codes.

Bid Information:

DPMC Qualification:

Cost of Documents:

Bidding Requirements:

(C068) Roofing – Membrane Modified Bitumen (C070) Roofing –Built Up

Free via online PDF.
Bidding documents will be released only in full sets. Partial sets, or sets split out by trade will not be released. Bid Documents will be sent to recipients at their request via e-mail.

Bids will be accepted from a single general contractor for a lump sum bid only.

Schedule:

Drawings Available:

Pre-Bid Walkthrough:

Addendum:

Bids Due / Opening:

Commence Construction:

Substantial Completion:

Friday, January 29, 2021 at the offices of Parette Somjen Architects L.L.C.

Tuesday, February 02, 2021 at 2:00pm

Tuesday, February 23, 2021 @ 11:00am at the Parsippany Troy Hills BOE at 292 Parsippany Road, Parsippany, NJ 07864

Monday, March 15, 2021

Wednesday, June 23, 2021