The scope of the project includes, but is not limited to, the scope of this project includes the removal of the existing roof system and insulation down to the substrate. Installation of a new built-up membrane roof system with tapered insulation and new drains throughout the areas to meet all current codes including, but not limited to, all energy codes.

Bid Information:

DPMC Qualification:

Cost of Documents:

Bidding Requirements:

(C068) Roofing – Membrane Modified Bitumen or (C070) Roofing – Built Up

Free via online PDF.

Bids will be accepted from a single general contractor for a lump sum bid only.

Schedule:

Drawings Available:

Pre-Bid Walkthrough:

Addendum:

Bids Due / Opening:

Commence Construction:

Substantial Completion:

Friday, January 29, 2021 at the offices of Parette Somjen Architects L.L.C.

Tuesday, February 02, 2021 at 2:00pm

Tuesday, February 23, 2021 @ 11:00am at the Parsippany Troy Hills BOE at 292 Parsippany Road, Parsippany, NJ 07864

Wednesday, June 23, 2021

Friday, August 27, 2021