Project Number:

8394

Montville Township Board of Education

Roof Replacement at Cedar Hill Elementary School

Project Information:

Client:

Project Name:

Project Architect:

Project Description:

Montville Township Board of Education

Roof Replacement at Cedar Hill Elementary School

C. William Ross

The scope of the project includes, but is not limited to, the replacement of the existing roofing system.

Bid Information:

DPMC Qualification:

Cost of Documents:

Bidding Requirements:

(C068) Roofing – Membrane Modified Bitumen
(C070) Roofing -Built Up

$0.00
Bidding documents will be released only in full sets. Partial sets, or sets split out by trade will not be released.
Specifications, proposal forms, etc. may be obtained on March 05, 2021, via downloaded from the FTP website. Said bidding documents may be obtained by submitting a request to wross@planetpsa.com. Bidding documents will not be mailed, emailed or available for pickup or inspection. They may only be downloaded from the FTP website with access granted among request.

Bids will be accepted from a single general contractor for a lump sum bid only.

Schedule:

Drawings Available:

Pre-Bid Walkthrough:

Addendum:

Bids Due / Opening:

Commence Construction:

Substantial Completion:

Friday, March 05, 2021 virtually from the offices of Parette Somjen Architects L.L.C via OneDrive. Drawings will be available for contractor review upon request Monday - Thursday from 9:00am - 4:00 pm and Friday from 9:00am - 1:00 pm.

Thursday, March 11, 2021 at 11:00 AM

Tuesday, March 23, 2021

Tuesday, April 06, 2021 @ 10:00 AM at the Virtual Zoom Meeting held by the Montville Township BOE

Monday, June 28, 2021

Friday, August 27, 2021

Bidder's List:

© 2020 Parette Somjen Architects, LLC

|

email.png