Project Number:
8517
Bloomfield Board of Education
Roof Replacement at Forest Glen Early Childhood Center and Franklin School
Project Information:
Client:
Project Name:
Project Architect:
Project Description:
Bloomfield Board of Education
Roof Replacement at Forest Glen Early Childhood Center and Franklin School
C. William Ross
The scope of this project includes, but is not limited to, the replacement of the existing roof systems with a new modified bituminous built-up roof system. The existing roofs are in disrepair and beyond its useful life.
Bid Information:
DPMC Qualification:
Cost of Documents:
Bidding Requirements:
(C068) ROOFING-MEMBRANE MODIFIED BITUMEN
(C070) ROOFING – BUILT UP
$0.00
Bidding documents will be released only in full sets. Partial sets, or sets split out by trade will not be released.
Specifications, proposal forms, etc. may be obtained on October 30, 2020, via downloaded from the FTP website. Said bidding documents may be obtained by submitting a request to wross@planetpsa.com. Bidding documents will not be mailed, emailed or available for pickup or inspection. They may only be downloaded from the FTP website with access granted among request.
Bids will be accepted from a single general contractor for a lump sum bid only.
Schedule:
Drawings Available:
Pre-Bid Walkthrough:
Addendum:
Bids Due / Opening:
Commence Construction:
Substantial Completion:
Friday, February 12, 2021 only via download from the FTP website with access granted among request. Said bidding documents may be obtained by submitting a request to wross@planetpsa.com.
Tuesday, February 23, 2021 at 1:00PM. Meet at the main entrance of Forest Glen, located at 280 Davey Street, Bloomfield, NJ 07003.
Wednesday, March 3, 2021
Tuesday, March 16, 2021 @ 1:00PM at the Board Offices Located at 155 Broad Street, Bloomfield, NJ 07003.
Monday, June 28, 2021
Friday, August 20, 2021
Bidder's List: