Project Number:

8590

Great Meadows Regional BOE

Boiler Replacement at Central Elementary School

Project Information:

Client:

Project Name:

Project Architect:

Project Description:

Great Meadows Regional BOE

Boiler Replacement at Central Elementary School

David Didimamoff

The scope of this project includes, but is not limited to, the replacement of Boiler #1 at Central Elementary School. The existing steam boiler will be replaced with a new steam boiler of comparable size and capacity. The existing boiler controls, breeching (including the draft fan) will be replaced. The existing steam distribution piping within the boiler room and wiring will be modified as needed to connect the new equipment. Combustion air system and carbon monoxide detection will be reviewed and included as needed for code compliance. The existing exterior double doors and louver will be replaced.

Bid Information:

DPMC Qualification:

Cost of Documents:

Bidding Requirements:

(C032) HVACR (C033) BOILERS

$0.00 Non‐Refundable.
Bidding documents will be released only in full sets. Partial sets, or sets split out by trade will not be released. Bid Documents may be delivered to recipients upon request submitted to ddidimamoff@planetpsa.com

Bids will be accepted from a single general contractor for a lump sum bid only.

Schedule:

Drawings Available:

Pre-Bid Walkthrough:

Addendum:

Bids Due / Opening:

Commence Construction:

Substantial Completion:

Friday, February 12, 2021 at the offices of Parette Somjen Architects
L.L.C.

Tuesday, February 16, 2021d at 3d:00f PM.

Thursday, March 10, 2021 @ 11:00 AM at the Board Offices Located at P.O. Box 74, Great Meadows, NJ 07838

Thursday, July 8, 2021

Wednesday, September 1, 2021

Bidder's List: