Project Number:
9419
Morris School District
Roof Replacement @ Morristown High School
Project Information:
Client:
Project Name:
Project Lead:
Project Description:
Morris School District
Roof Replacement @ Morristown High School
Joshua Thompson
The scope of this project includes, but is not limited to, the removal and replacement of approximately 65,300 square feet of roof in the rear wing of the building. The existing roof membrane and insulation system will be removed down to the existing decking and replaced with a new multi-ply built up roof membrane system with a tapered rigid insulation. Included will be the installation of new metal edge, roof drains and flashing required as well as replacement of the atrium skylight.
Bid Information:
DPMC Qualification:
(C008) GENERAL CONSTRUCTION – or –
(C009) GENERAL CONSTRUCTION / ALTERATIONS / ADDITIONS – or –
(C068) ROOFING MEMBRANE MODIFIED BITUMEN – or –
(C070) ROOFING – BUILT UP
Cost of Documents:
Bidding Requirements:
Bids will be accepted from a single general contractor for a lump sum bid as follows:
Schedule:
Drawings Available:
Wednesday, November 20, 2024
Pre-Bid Walkthrough:
Addendum:
Bids Due / Opening:
Monday, November 25, 2024
Thursday, December 19, 2024
Commence Construction:
Substantial Completion:
Friday, June 20, 2025
Monday, August 25, 2025
Bidder's List:
Bidders | Address | Telephone |
---|
Bidders | Address | Telephone |
---|