Morris School District

Roof Replacement @ Morristown High School

Project Information:

Client:

Project Name:

Project Lead:

Project Description:

Morris School District

Roof Replacement @ Morristown High School

Joshua Thompson

The scope of this project includes, but is not limited to, the removal and replacement of approximately 65,300 square feet of roof in the rear wing of the building. The existing roof membrane and insulation system will be removed down to the existing decking and replaced with a new multi-ply built up roof membrane system with a tapered rigid insulation. Included will be the installation of new metal edge, roof drains and flashing required as well as replacement of the atrium skylight.

Bid Information:

DPMC Qualification:

(C008) GENERAL CONSTRUCTION – or –
(C009) GENERAL CONSTRUCTION / ALTERATIONS / ADDITIONS – or –
(C068) ROOFING MEMBRANE MODIFIED BITUMEN – or –
(C070) ROOFING – BUILT UP

Cost of Documents:

Bidding Requirements:

Bids will be accepted from a single general contractor for a lump sum bid as follows:

Schedule:

Drawings Available:

Wednesday, November 20, 2024

Pre-Bid Walkthrough:

Addendum:

Bids Due / Opening:

Monday, November 25, 2024

Thursday, December 19, 2024

Commence Construction:

Substantial Completion:

Friday, June 20, 2025

Monday, August 25, 2025