The scope of the project includes, but is not limited to, the following:

1. (HES) The scope of this project includes, but is not limited to, HVAC upgrades to interior, windowless rooms 122 (PE Office), 123 (Faculty Room), and K1 (Kitchen) by adding HVAC cassette units which will provide heating, cooling, and fresh air at Hazelwood Elementary school. This project will include modifications to the electrical system and existing roof system.

2. (MHS) The scope of this project includes, but is not limited to, the replacement of existing Unit ventilators in 13 classrooms along the 100 Corridor in the 1958 wing at Middlesex High School. New UVs to be equipped with DX coils, replacement of associated exhaust system, BMS controls (existing front end to remain), select

abatement, and modifications to the air intake as required by code.

3. (PES) The scope of this projects includes, but is not limited to, to replacement of

existing Unit Ventilators in six (6) classrooms on the first floor at Parker Elementary

School. New UVs to be equipped with DX coils, replacement of associated exhaust

system, BMS controls (existing front end to remain), select abatement, and

modifications to the air intake as required by code.

4. (WES) The scope of this project includes, but is not limited to, to the replacement of

the existing Boiler at Watchung Elementary School..

Bid Information:

DPMC Qualification:

(C008) – General Construction or C009 – General Construction/ Alteration & Additions.(C029) – Structural Steel and Ornamental Iron
(C030) – Plumbing
(C032) – HVACR
(C047) – Electrical

Cost of Documents:

Bidding Requirements:

Bids will be accepted from a single general contractor for a lump sum bid as follows:

Schedule:

Drawings Available:

Tuesday, November 19, 2024

Pre-Bid Walkthrough:

Addendum:

Bids Due / Opening:

Wednesday, November 20, 2024 at
3:00pm at Middlesex HS, 300 John F Kennedy Dr, Middlesex, NJ
08846. Meeting at the Main Office.
3:30pm at Parker ES, 150 S Lincoln Ave, Middlesex, NJ 08846.
Meeting at the Main Office.
4:00pm at Watchung ES, 1 Fisher Ave, Middlesex, NJ 08846.
Meeting at the Main Office.
4:30pm at Hazelwood ES, 800 Hazelwood Ave, Middlesex, NJ
08846. Meeting at the Main Office.

Thursday, December 12, 2024 at 1:00pm at 300 John F Kennedy Dr, Middlesex, NJ
08846

Commence Construction:

Substantial Completion:

Monday, June 30, 2024

Wednesday, August 20, 2024