top of page

Project Number:

10630

Summit Public Schools Board of Education

Generator Replacement at Lawton C. Johnson Middle School

Project Information:

Client:

Project Name:

Summit Public Schools Board of Education

Generator Replacement at Lawton C. Johnson Middle School

Project Contact:

Project Description:

Matt Binshtock

The scope of this project includes, but is not limited to, the replacement in kind of the existing 150kW Natural Gas Generator. In addition, the replacement of associated transfer switch, replace existing wiring within the conduits, replace existing concrete slab and repair fence where required.

Bidding Requirements:

Bids will be accepted from a single general contractor for a lump sum bid

Bidder Qualification:

(C008) GENERAL CONSTRUCTION
(C009) GENERAL CONSTRUCTION / ALTERATIONS / ADDITIONS
(C047) ELECTRICAL

Major Subcontractor:

(C047) ELECTRICAL

Specialty Subcontractor:

N/A

Schedule:

Drawings Available:

Pre-Bid Walkthrough:

Tuesday, October 6, 2026

Wednesday, October 14, 2026 at 1:00 PM at 272 Morris Ave, Summit, NJ 07901

Addendum:

Bids Due / Opening:

Tuesday, October 27, 2026

Thursday, November 5, 2026 at 1:00 PM at 14 Beekman Terrace, Summit, NJ 07901

Commence Construction:

Friday, November 13, 2026

Substantial Completion:

Wednesday, August 18, 2027