Project Number:
9018BA
Montclair Board of Education
HVAC Upgrades @ Buzz Aldrin Middle School
Project Information:
Client:
Project Name:
Project Lead:
Project Description:
Montclair Board of Education
HVAC Upgrades @ Buzz Aldrin Middle School
William Ross
The scope of this project includes building wide upgrades for installation of new HVAC systems including:
1. Heat, ventilation, air conditioning, exhaust, ductwork and piping.
2. New equipment includes, but it not limited to Classroom Unit Ventilators, Air Handlers,
Packaged Heating and Cooling Systems, and Split Systems.
3. Replacement of two (2) existing boilers, associated pumps and other components with a new
multi boiler plant.
4. The removal and replacement of the existing main building electrical switch gear.
Bidding Requirements:
Bids will be accepted from a single general contractor for a lump sum bid
Bidder Qualification:
(C032) HVACR
(C008) GENERAL CONSTRUCTION or (C009) GENERAL CONSTRUCTION / ALTERATIONS / ADDITIONS
(C029) STRUCTURAL STEEL AND ORNAMENTAL IRON
(C030) PLUMBING
(C047) ELECTRICAL
Major Subcontractor:
Specialty Subcontractor:
Schedule:
Drawings Available:
Pre-Bid Walkthrough:
Addendum:
Bids Due / Opening:
Commence Construction:
Substantial Completion:
Monday, January 6, 2025
Tuesday, January 14, 2025 at 3:00pm at 173 Bellevue Ave, Upper Montclair, NJ 07043
Thursday, February 6, 2025 at 12:00pm at 22 Valley Road. Montclair, New Jersey, 07042
Monday, June 30, 2025
Tuesday, August 24, 2027
Bidder's List:
Bidders | Address | Telephone |
---|
Bidders | Address | Telephone |
---|