top of page

Project Number:

9018BA

Montclair Board of Education

HVAC Upgrades @ Buzz Aldrin Middle School

Project Information:

Client:

Project Name:

Project Lead:

Project Description:

Montclair Board of Education

HVAC Upgrades @ Buzz Aldrin Middle School

William Ross

The scope of this project includes building wide upgrades for installation of new HVAC systems including:


1. Heat, ventilation, air conditioning, exhaust, ductwork and piping.

2. New equipment includes, but it not limited to Classroom Unit Ventilators, Air Handlers,

Packaged Heating and Cooling Systems, and Split Systems.

3. Replacement of two (2) existing boilers, associated pumps and other components with a new

multi boiler plant.

4. The removal and replacement of the existing main building electrical switch gear.

Bid Information:

DPMC Qualification:

(C032) HVACR
(C008) GENERAL CONSTRUCTION or (C009) GENERAL CONSTRUCTION / ALTERATIONS / ADDITIONS
(C029) STRUCTURAL STEEL AND ORNAMENTAL IRON
(C030) PLUMBING
(C047) ELECTRICAL

Cost of Documents:

Bidding Requirements:

Bids will be accepted from a single general contractor for a lump sum bid as follows:

Schedule:

Drawings Available:

Monday, January 6, 2025

Pre-Bid Walkthrough:

Addendum:

Bids Due / Opening:

Tuesday, January 14, 2025 at 3:00pm at 173 Bellevue Ave, Upper Montclair, NJ 07043

Thursday, February 6, 2025 at 12:00pm at 22 Valley Road. Montclair, New Jersey, 07042

Commence Construction:

Substantial Completion:

Monday, June 30, 2025

Tuesday, August 24, 2027

Bidder's List:

Bidders
Address
Telephone
Bidders
Address
Telephone
bottom of page